Churchill Avenue Renovation in Progress

We are excited watching this bathroom renovation in progress.  With the exception of the toilet, everything has been relocated within the new design! The stand-up shower has been removed, as has the bathtub.  All floor and wall tiling have been replaced by 12 x 24" porcelain tiles. The plumbing and venting have been altered to adapt to the new fixtures. The lighting has been revamped, including the addition of LED slim-line potlights on an electonic dimmer switch.  Three potlights have been installed over the vanity.   The homeowners now have a much larger, floating vanity, with banks of drawers of either side.  Watch for the addition of a new quartz countertop and backsplash!